Calculate DOT Concrete Sand. Type in inches and feet of your project and calculate the estimated amount of Sand / Screenings in cubic yards, cubic feet and Tons, that your need for your project. The Density of DOT Concrete Sand: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t.


Concrete and Mortar Ratio for Foundation. The cement concrete 1:8:16 is generally used in the foundation of walls in construction work. In the case of column raft cement concrete, 1:4:8 is the best-recommended ratio for it in the foundation. For brick masonry, cement mortar 1:4 to 1:6 is used as a loading condition.


This video is prepared to understand the calculation of the quantity of Cement, Sand and Gravel for Concrete Suspended Slab (Philippines Construction)


1 Cement 2 Sand 3 Aggregate (gravel) is too strong. 16bags (costly) 1 Cement 2.5 Sand 4 Aggregate is OK for fence posts. 13bags of cement per cubic metre. The more cement the more costly of course so don't over do it. Note: These are 20kg bags of General Purpose cement.


Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete. Calculator are provided for a general mix and a paving mix, the different ratio of materials are: General mix - 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. Paving mix - 1:3½ cement:all-in ...


Answer (1 of 4): A lot of people don't understand concrete! To make 1 cubic meter of concrete you need 1 cubic meter of coarse aggregate. Assuming only fine aggregate (sand) is used with the coarse aggregate you will need enough to fill the voids somewhere in the range of 0.4m3 to 0.6m3 dependi...


So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose Bulk Densities) method is an accurate method to calculate cement, sand and aggregate for a given nominal mix concrete.


A bag of 40kg cement yields about 0.98 cubic feet volume, regarding this, How much sand and gravel do I need for a bag of 40kg cement, generally you will need about 1.96 cubic feet of sand and 3.92 cubic feet of gravel per 40kg bag of cement by using mix ratio 4 parts gravel to 2 parts sand to 1 parts cement (4:2:1) for 3000 psi or 20 MPa of ...


The table below can be used to estimate how much cement, sand and hollow blocks will be needed to build a wall of a given area in square meters. Each square meter requires about 12.5 hollow blocks. Class B is a mixture of sand and cement (mortar) with a 1 is to 3 ratio of cement and sand. Class C has a ratio of 1 part cement per 4 parts sand.


Answer (1 of 2): About 125 pounds of dry material is needed to make 1 cubic foot of concrete. A standard recipe for concrete is 1 part cement, 2 parts sand and 3 parts gravel. You will require about 20.8 pounds cement, 41.7 pounds sand and 62.5 pounds gravel. This is about 2 1/4 - …


The price of quartz depends on the market, availability, and the proximity of a quartz quarry. Expect similar prices to river rock: $100-500 per cubic yard, $100-700 per ton, and $10-15 per bag. Estimating How Much Gravel Needed. Gravel generally gets sold by the cubic yard but can be bought by the ton for large jobs and by the bag for small ...


Hence for every 1 part of cement, we have to use 2 part of sand and 4 part of gravel to get M15 ratio concrete. The volume of 50 kg cement bag is 1.25 CFT. We can check this value by dividing the weight of the cement bag by the bulk density of cement. The volume of batching box used in the construction site is also 1.25 CFT.


It varies from 10 – 20%. For our case lets assume it as 15% of total cost of materials, labours and equipments. We have calculated the quantity of every item in above 1 – 3 steps. For rate analysis of RCC, we need to multiply each quantity with their rates to get the amount for every item of work.


Two Concrete Calculator are provided for different concrete mixes: General mix - 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. and. Paving mix - 1:3½ cement:all-in ballast or 1:1½:2½ cement:sharp sand:gravel. Comment: If you are wondering how 1:2½:3½ equals 1:5 ("shouldn't it be 1:6" I hear someone say), the answer is ...


500 pounds cement, 1500 pounds sand, 1600 pounds gravel. Mix with 32 gallons water


crusher dust cubic yard to metric tonne. Pounds, Tons, Kilograms, Metric Tons Find how much crushed stone is needed for a gravel driveway in cubic yards and tons, and estimate the cost of materials. one ton crusher run how many volume Apr 4, 2019 1 Metric Ton Crusher Run how many cubic feet of stone dust are in 1 tonne metric How many ton crusher run per cubic meter Answers.


Answer (1 of 2): There are many classes of cement : sand : stone ratios you failed to mention. For example 1:2:4, 1:2:8, 1:4:8, etc. Carpenters and masons use these ratios wken mixing concrete. They used a cubical box to measure the components needed. Let us presume the cubical box measures 40...


inches. Material: Concrete sand Masonry Sand #8 Gravel #67 Gravel 2 Inch Gravel #57 Bluestone #67 Bluestone #7 Bluestone #8 Bluestone CR6 Bluestone 3/4in. Lightweight. Per cubic foot: Tips for Ordering Concrete. Quality – Concrete is a perishable product and should be treated as such. Time, weather conditions including a temperature of the ...


The leaner mix is not capable of closing the voids in sand, and hence the plastered surface will remain porous. As per IS: 2260-1981 (Indian Standard), the strength of the mortar depends upon the proportion of cement and sand. Strength obtained with the various proportions of …


Cement & Sand Unit Minimum Rate Average Cost Max. Price; Cement: Qty ₹ 429 ₹ 471.9 ₹ 514.8: River Sand: Qty ₹ 5050 ₹ 5555 ₹ 6060: M Sand: Qty ₹ 3939 ₹ 4332.9


Cement & Sand Unit Minimum Rate Average Cost Max. Price; Cement: Qty ₹ 425 ₹ 467.5 ₹ 510: River Sand: Qty ₹ 5000 ₹ 5500 ₹ 6000: M Sand: Qty ₹ 3900 ₹ 4290


Cement. 43 Grade Cement; 53 Grade Cement; Portland Pozzolana Cement; Concrete Cement; Portland Slag Cement; Ready Mix Concrete. M20 RMC; M25 RMC; M30 RMC; M35 RMC; TMT Steel Bars. Fe-500 TMT Steel Bars; Fe-500 D TMT Bars; Fe-550 TMT Bars; Fe-550 D TMT Bars; Fe-600 TMT Steel Bars; TMT Consumables. TMT Binding Wires; Concrete Cover Blocks; TMT ...


Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.


One popular formula for making concrete is the "1-2-3": 1 part portland, 2 parts sand, 3 parts gravel. A 94# bag of portland (approximately 1 cubic foot) would yield 6 …


Grade of mortar = 1:6 (cement : sand) Class A brick (19 cm x 9 cm x 9 cm) Volume of brickwork = 1.0 m^3 Thickness of mortar = 10 mm Step 1 :- Calculation of bricks. No. of bricks = (volume of brick work / volume of one brick with mortar) Volume …


Our sand calculator can be used to work out how much sand your next landscaping project will require. Work out the total volume, weight and cost of the sand. ... Aggregate calculator Concrete Calculator Landscape calculator Cubic yards calculator . ... but when buying by bulk the sand weighs 240 pounds per 4 cubic feet. I can therefore ...


Step-1:Calculate the dry volume of cement and sand mixture required. Volume of plaster = Area X Thickness = 10 sq.m. X 0.012 = 0.12 cu.m. The wet volume of the mixture is always less than the dry volume. Dry volume of motor required for plastering = 1.27 X Dry volume of plaster = 1.27 X 0.012 = 0.1524 cu.m.


Handy guide on factors to multiply per cubic on different concrete class mixtures. Just multiply each factor to the total volume (in cubic meter) and you'll get the needed amount of cement (40Kg/bag), sand (cu.m.) and gravel (cu.m.). Class C (2,000 psi) Cement 5.634 Bags Sand 0.4794 cu.m. Gravel 0.898 cu.m. Class B (2,500 psi)…


All types of super sulphate, slag, aluminous and Portland cement - whether coloured or clinkered - attract a standard GST rate of 28 percent. GST on iron and steel. All iron and steel products attract a uniform GST rate of 18 percent. It includes rods, wires, blocks and rolls. GST rate for tiles.


Therefore required cement = 1440 x 0.221 m 3 = 318.24 Kg or (318.24/50) = 6.37 Bags. Cement Bag Per Cubic Metre Concrete Table – Nominal Mix


The calculation of rate (cost) per unit of any construction work is known as Rate Analysis. It includes the quantity & cost of required materials, labour charges and other petty expenses. The analysis depends on the scope of work. You can calculate the rate of analysis for almost every construction work. Rate Analysis Of Concrete.


Cement is much more expensive than sand or gravel. For this reason, the amount of sand and gravel or aggregates in the concrete is maintained at around 60 to 80 percent of the total volume. However, the quantities used to affect the product. The more aggregate used in the more rigid mixture that concrete becomes.


FULLER'S RULE states "mixing of a total of 42 volumes of cement, sand and gravel will produce a 27 volumes of concrete". The unit for this one is in cubic foot. Conversion of 1.0 meter = 3.281 ft, hence (42/27cu.ft) x (3.281ft/m)^3=54.94 or rounded off to a good number of 55.


How much sand,cement and gravel do i need to cover an area of 20m2 at 2" deep? Measurements and Units 1 meter = approx 39.37 inches 1 square meter = 39.37"^2 multiply that …